旧ブログから全325記事を順次WordPressに移行中です。カテゴリやタグから旧記事もぜひご覧ください。

Understanding Building Standards Law Changes Since 1981

English
Disclosure: This article contains affiliate links. As an Amazon Associate and Amazon.co.jp Associate, I earn from qualifying purchases at no extra cost to you. I only recommend products I personally use or have thoroughly researched.

One number changed my entire acquisition strategy: June 1, 1981. That’s the date Japan’s Building Standards Law (u5efau7bc9u57fau6e96u6cd5, Kenchiku Kijunho) earthquake resistance rules were overhauled, and any property with a building permit issued before that date is judged under the old seismic code, known as kyu-taishin (u65e7u8010u9707). I learned this the expensive way in my second year as a landlord, when a bank flatly refused to finance a pre-1981 apartment building I had already put a 500,000 yen deposit on. Nine properties and 15-plus years later, I still check this date before I check almost anything else on a listing.

If you’re buying, renting out, or renovating property in Japan, the 1981 line isn’t trivia u2014 it affects your loan terms, your insurance premiums, your resale value, and in some cases whether tenants will even consider your unit. Here’s what I’ve learned managing a mixed portfolio that includes both sides of that line.

What actually changed in 1981

Must Read

ud83duded2 RECOMMENDED PRODUCTS

Japan Real Estate Investment Guides

Understand the market before you enter it u2014 these books accelerate your learning curve.

Before 1981, the old code was designed around a magnitude-7-class quake causing no more than moderate damage, with total collapse considered acceptable in a truly massive event. The 1981 revision, called shin-taishin (u65b0u8010u9707u57fau6e96, “new earthquake resistance standard”), raised the bar significantly: a building built to the new code is expected to survive a magnitude-6-strong or -7 event without collapsing, even if it sustains structural damage. The revision tightened requirements on wall placement, column-to-beam connections, and the overall rigidity balance of a structure. After the 1995 Great Hanshin earthquake, roughly 30% of pre-1981 wooden buildings in the hardest-hit zones were destroyed or had to be demolished, compared to a much smaller share of post-1981 structures. That data point is why banks, insurers, and increasingly tenants treat 1981 as a hard line rather than a rough guideline.

Why the permit date matters more than the completion date

ud83duded2 RECOMMENDED ON AMAZON US

Japanese Language Textbooks (N3 Level)

Reading contracts in Japanese removes your dependence on agents and translators.

Check Price on Amazon u2192

This trips up a lot of first-time buyers, including me back when I was looking at property number two. What matters legally isn’t when the building was finished u2014 it’s when the building confirmation (kenchiku kakunin, u5efau7bc9u78bau8a8d) was issued. A building permitted in December 1980 and completed in March 1982 is still classified as kyu-taishin, because the design was approved under the old rules. I now ask agents for the kakunin-shinsei date specifically, not just the registered completion year on the listing sheet, because I’ve seen at least two listings where the two dates were nine months apart.

The practical impact on financing and insurance



On my own properties, the difference shows up in three places:

  • Mortgage approval: several regional banks I’ve worked with cap loan-to-value around 60-70% on kyu-taishin buildings without a seismic retrofit certificate, versus 80-90% on shin-taishin properties.
  • Earthquake insurance premiums: on a comparable wood-frame unit, I pay roughly 15-20% more per year for earthquake coverage on my one remaining pre-1981 building than on an equivalent post-1981 unit.
  • Registration tax breaks: several tax reduction programs for home loan deductions and registration and license tax require either a shin-taishin certificate or a taishin (seismic) compliance report u2014 without one, buyers lose access to deductions worth several hundred thousand yen over the life of a loan.

What I look for on a pre-1981 property before buying

ud83duded2 RECOMMENDED PRODUCTS

Due Diligence Checklists & Guides

Never skip due diligence. These tools help you ask the right questions.

I haven’t ruled out kyu-taishin buildings entirely u2014 the discount on purchase price can be 20-30% versus a comparable shin-taishin property in the same neighborhood, and that gap sometimes makes the numbers work even after retrofit costs. But I never buy one blind. I get a taishin shindan (u8010u9707u8a3au65ad, seismic diagnosis report) done before closing, which typically runs 150,000 to 300,000 yen for a small apartment building depending on size and structure type. If the Is value (structural strength index) comes back below 0.6, I budget for retrofit work, which on a wood-frame building I’ve had done for between 800,000 and 2.5 million yen depending on scope u2014 adding steel brackets at joints, replacing load-bearing walls, or reinforcing the foundation.

How this affects renting the unit out

Tenants are more aware of this than they were a decade ago. On listing sites, shin-taishin status now gets flagged automatically, and I’ve noticed my pre-1981 units sit vacant roughly 2-3 weeks longer on average than comparable shin-taishin listings at the same rent. My workaround has been transparency: I list the retrofit work I’ve had done, include the Is value from the diagnosis report in the listing notes, and price the unit about 5,000-8,000 yen below market to compensate. That’s kept occupancy steady even on the older building.

A quick checklist before you commit to any property

  • Confirm the kenchiku kakunin (building confirmation) date, not the completion date
  • Ask whether a taishin shindan has ever been performed and request the report
  • Check the Is value if a diagnosis exists u2014 below 0.6 generally means retrofit work is advisable
  • Get a firm quote from your bank on loan-to-value before assuming standard financing terms
  • Factor the earthquake insurance premium difference into your annual cash flow projection

That’s the process I now run on every single acquisition, whether the building looks new or not u2014 because paperwork lies about age far more often than the paint job does. It’s a five-minute check that has saved me from at least two bad purchases across my 9 properties.

ud83dudcdd DIY FATHER u2014 PREMIUM RESOURCE

Complete Roadmap: First Rental Property in Japan

Everything I wish I knew before my first purchase u2014 financing, due diligence, negotiation, and year-one management guide.

u00a5500
Get it on note u2192
One-time purchase u00b7 Instant download

ud83cudfe0 More from DIY Father

15 years of landlord experience u00b7 3 apartment buildings u00b7 DIY renovations that saved millions of yen. Browse all articles at diytosan.com

プライバシーポリシーお問い合わせ
タイトルとURLをコピーしました