Wood Deck Build #32: Foundation Work Part 2 u2014 Simple Concrete Pads u2014 DIY Dad

English
Disclosure: This article contains affiliate links. As an Amazon Associate and Amazon.co.jp Associate, I earn from qualifying purchases at no extra cost to you. I only recommend products I personally use or have thoroughly researched.

ud83dudcda Wood Deck Build Log u2014 6 of 19

u2190 Build #31: Foundation Pt.1  u00b7  Series Index  u00b7  Build #33: Foundation Pt.3 u2192

2026 Update from DIY Dad: Construction Begins u2014 Foundation to Skeleton Assembly

Most Important

ud83duded2 RECOMMENDED PRODUCTS

Pressure-Treated Deck Lumber

Pressure-treated lumber is the baseline u2014 skip it and you’ll be rebuilding in 5 years.

After a long planning phase, construction finally begins! From setting the footing stones to assembling the steel pipe skeleton u2014 this is the heart of the wood deck build.

Footing Stone Installation Steps

  1. String a layout line over the installation area for positioning (layout marking)
  2. Dig the hole, fill with gravel and compact it
  3. Set the footing stone while checking level with a spirit level
  4. Align the height of each footing stone with the neighboring ones (using the layout line as reference)

The most critical step is getting all footing stones at the same height. If this is off, it affects the entire skeleton assembly that follows.

Rust-Proof Painting of the Steel Pipes

Since the steel scaffold pipes are made of steel, rust-proof painting is essential. Apply rust-inhibiting primer, let it dry, then apply a topcoat. Make sure to paint the cut ends as well. Apply paint to the areas where clamps will grip before starting assembly.

This extra step makes a huge difference in durability 10 years down the line. I treated it as an upfront investment to reduce future maintenance.

Skeleton Assembly Sequence

  1. Fix the bundle posts (vertical) to the footing stones
  2. Fix the beams / oki (horizontal) to the bundle posts
  3. Fix the floor joists / neta (cross members supporting the decking) to the beams
  4. Final-tighten each connection while confirming level and plumb

Always follow the sequence: temporary tighten u2192 check overall level and plumb u2192 final tighten. If you final-tighten one spot before moving on, you won’t be able to adjust later.

Construction Log

ud83duded2 RECOMMENDED PRODUCTS

Deck Stains & Waterproof Sealers

Stain every 2u20133 years. It’s the single cheapest way to double deck lifespan.

Hi, I’m DIY Dad.

Continuing with the exterior renovation series. Once the weeds were cleared, it was time to pour the foundation. Full form-work and rebar would be a hassle, so I went with a simple version: dig the hole, pour ready-mix concrete, level it off. In other words, essentially just a blinding concrete pour.

u57fau790e-u539fu56f3.JPG

u2191 Wood deck simple foundation sketch

The concrete mix ratio I used was: Cement : Sand : Gravel = 1 : 3 : 9

  • Cement: 25 kg bag from the home center u2014 u00a5498
  • Gravel: fill-your-own sandbag at the home center, about 25 kg for u00a5398
  • Sand: fill-your-own sandbag, u00a5298

Estimated concrete volume per foundation point:

  • 0.3 m u00d7 0.3 m u00d7 0.2 m = 0.018 mu00b3 per point
  • 6 foundation points needed u2192 approx. 0.12 mu00b3 total
  • Volume per sandbag: approx. 0.02 mu00b3
  • Total bags needed: 0.12 / 0.02 = 6 bags

Breaking that down by material:

  • Cement: 6 / 13 = 0.46 bags
  • Sand: 6 / 13 u00d7 3 = 1.38 bags
  • Gravel: 6 / 13 u00d7 9 = 4.15 bags

I mixed all of this by hand. Quite a physical workout.

After pouring the simple foundation, I had to wait for it to cure. Concrete typically takes 2 weeks to reach its design strength. Looking at residential construction sites around town, you sometimes see the formwork removed and the sill plate installed the very next day u2014 I always wonder if that’s the kind of corner-cutting you see in the news…

In practice, it seems 2 days is common, with project schedules in mind. But for this wood deck, I could only work on weekends anyway, so I left it for a full week including the weekdays.

That’s all for today!

ud83dudcda Wood Deck Build Log u2014 6 of 19

u2190 Build #31: Foundation Pt.1  u00b7  Series Index  u00b7  Build #33: Foundation Pt.3 u2192

ud83dudcdd DIY FATHER u2014 PREMIUM RESOURCE

DIY Renovation Quote Review Manual

How to read, compare, and negotiate contractor quotes. This manual saved me u00a5800,000 on a single renovation project.

u00a5300
Get it on note u2192
One-time purchase u00b7 Instant download

ud83cudfe0 More from DIY Father

15 years of landlord experience u00b7 3 apartment buildings u00b7 DIY renovations that saved millions of yen. Browse all articles at diytosan.com

プライバシーポリシーお問い合わせ
タイトルとURLをコピーしました